Planning a bathroom renovation? Start with a clearer estimate.

A practical checklist for Metro Vancouver homeowners: photos, priorities, fixtures and questions to prepare before requesting a bathroom renovation estimate.

Budova Renovation Service ·

Tiled bathroom completed by Budova Renovation
From the Budova Renovation project portfolio.

Describe the problem before choosing the finishes

Start with what is not working: limited storage, an awkward layout, a tired bathtub or a shower that no longer suits your household. Separate must-haves from nice-to-haves. That gives your contractor a useful starting point before tile colours and fixtures enter the conversation.

Write a short scope such as “replace the bathtub, update the vanity and improve storage while keeping the current layout.” If you are still deciding between a bathtub and a shower, say so. Pricing a defined scope is more useful than comparing two estimates built on different assumptions.

Send photos that explain the room

Take a wide photo from the doorway, then show the bathtub or shower, vanity, toilet and floor. Include close-ups of visible damage and any access constraints. Avoid sharing personal paperwork or people in the photos.

Approximate room dimensions and the property location help start the discussion. Photos are a starting point; concealed conditions and precise measurements may still need an on-site assessment. Do not open walls or disturb materials simply to obtain a quote.

Clarify who is choosing and supplying each item

List the fixtures and finishes you want to keep, replace or have not chosen yet. Include the vanity, sink, faucet, toilet, bathtub or shower fittings, tile, mirror and lighting. Product dimensions can affect how well the plan fits.

Budova can purchase core construction materials. Homeowners can choose finish items or ask for guidance. Ask for the estimate to distinguish supplied items, installation work and any allowances for selections that are still undecided.

Discuss access and everyday use

Mention whether this is your only bathroom, whether you will be living at home during the work, and whether parking, elevator bookings or building access need coordination. These details help make the work plan realistic.

For a strata property, ask your strata manager about the approval process before agreeing on a start date. Confirm responsibility for any required approvals with the contractor; requirements depend on the property, municipality and scope.

Compare the scope, not just the total

Ask what demolition, preparation, waterproofing, installation, waste removal and finishing are included. Ask how unexpected conditions will be documented and how changes will be agreed before extra work proceeds.

Keep a written list of exclusions and open decisions. Two quotes may look very different because one includes finish materials or additional work and the other does not. A clear scope makes those differences easier to understand.